Saturday, April 30, 2011

While we have been busy relaxing, our contractor has not. In past few weeks our home as gone from just the basement, to having a first floor sub floor, to having the first floor framed, to having the second floors with a sub floor. They framed the stairs this week too so we got to stand on the second floor with no walls around us. It was quite a view! Yesterday Jay and I went to pick out all our plumbing fixtures, fireplace, and the kitchen sink. It is so nice to be able to pick out whatever we want (within budget obviously) so the whole house can match our own taste and style.

April 17th- just the sub floor is down on the first floor.




April 23rd- All the rooms on the first floor are framed. We walked through each room and could feel the size of it and start to picture our furniture. Of course, without a ceiling each room felt much larger than it actually is! Jay climbed onto a pile of logs to get the aerial view.





This is the back of the house. Trey and I are looking out the kitchen window.

No comments:

Post a Comment